No.
Project Name
Location Of Delivery Point
Client
Project Date
1
Re-tubing Aux Boiler at 14.5 Ton Package 2
Muara Tawar
PT. PJB Muara Tawar
November 2014
2
Re-tubing LP EVA HRSG at 50 MW design existing by Sumitomo Corp. and maker by Austrian Energy 1 Unit
Semarang
PT. IP Semarang
January 2014
3
Unloading Coal and chemical cleaning
Bangka
PT. PJB Bangka
January 2014
4
Chemical Cleaning Outside Tube HP EVA & LP SH HRSG 3 Unit
Muara Karang
PT. PJB Muara Karang
January 2013
5
Re-tubing LP EVA, LP ECO & HP ECO HRSG at 50 MW design existing by Sumitomo Corp. and maker by Austrian Energy 3 Unit
Muara Karang
PT. PJB Muara Karang
May 2012
6
Re-tubing Aux Boiler at 14.5 Ton Package 1
Muara Tawar
PT. PJB Muara Tawar
January 2012
7
AUMA Actuator for FD Fan Rehabilitation Steam Power
-
Mitshubishi Corp.
January 2010
8
Line Desalination Sea Water Pump (DSWP) Plant
-
PT. PJB UPHB
January 2009
9
Installation of Fire Protection Pipe HRSG or GT Area
Muara Karang
PT. PJB Muara Karang
January 2009
«