Completed Project

Home / Completed Project / Re-tubing LP EVA, LP ECO & HP ECO HRSG at 50 MW design existing by Sumitomo Corp. and maker by Austrian Energy 3 Unit

Re-tubing LP EVA, LP ECO & HP ECO HRSG at 50 MW design existing by Sumitomo Corp. and maker by Austrian Energy 3 Unit

May 2012
Material used
  • Fin Tube
  • Bend Tube
  • Connection Piece
  • Header Tube
  • Suspensions for modules
  • Insulation plate board with thermal blanket
Construction Work
  • Replacing old tubes with installing new tubes
  • Preservation work for HRSG
  • Chemical cleaning and passivation
  • Blow off
  • Site cleaning and management of waste
  • Employing Certificated 6G Welder
  • Following standard WPS Procedure
  • Using Modular Installation Method
Tests and Inspections
  • Penetrant test join to header
  • 100% X-ray test tube joint
  • Hydrostatic test

Gallery :